• Skip to main content
  • Skip to footer

Steve Beeler

You have a goal…I have a way to get you there.

  • About Me
  • Project Management
  • Operations Engineering
  • Motorsports
  • EWC
  • Blog

Blog

Control Charts

April 16, 2018 by stevebeeler

To provide a rational means to categorize (common cause vs special cause) and measure variation, Walter A. Shewhart invented control charts circa 1925 – 1931. W. Edwards Deming took these basic statistical concepts and tools with him to Japan after World War II and planted the seeds for the quality revolution. The rest is history. […]

Filed Under: Operations Engineering Tagged With: Attributes Data, Control Charts, Statistical Process Control, U-Chart, Variables Data, X-bar & R Chart

Common Cause vs Special Cause

April 5, 2018 by stevebeeler

All manufacturing and business processes contain many sources of variation. The differences may be so small as to be difficult to detect, but they are there. Variation is at the root of all waste.  Less variation, less waste.  To reduce variation, and effectively solve problems, its sources must first be understood as common cause vs […]

Filed Under: Operations Engineering Tagged With: Common Cause, Control Charts, Special Cause, Statistical Control, Statistical Process Control, Variability Reduction

Best Constraint Location

February 1, 2018 by stevebeeler

In my previous blog on Theory of Constraints, I defined the constraint (aka, the bottleneck) as the weak link in the chain. Every system has one. If there is a choice, where is the best constraint location? The Ugly. By far the worst place to have the constraint is in the marketplace. When the constraint […]

Filed Under: Operations Engineering Tagged With: Bottleneck, Constraint, Theory of Constraints, weak link

5-Step Throughput Improvement Model

February 1, 2018 by stevebeeler

In my previous blog, I used the “ten machine” manufacturing puzzle to establish the need to think systemically: in isolation each machine hit its performance target, in combination the system failed to reach its goal. The 5-Step Throughput Improvement Model is a proven process to solve this local optimization paradox. Theory of Constraints views an […]

Filed Under: Operations Engineering Tagged With: 5-Step Throughput Improvement Model, Bottleneck, Constraint, Theory of Constraints, weak link

Theory of Constraints

February 1, 2018 by stevebeeler

“In isolation yes, in combination no” is a key concept in Theory of Constraints and bottleneck analysis. Consider the ten machine manufacturing process in the schematic below. Each machine had a team of manufacturing engineers managing their design and development. All ten teams hit their performance target: 50 units per hour and 98% availability. A […]

Filed Under: Operations Engineering Tagged With: Bottleneck, Interactions, Seven Wastes, Theory of Constraints

  • « Go to Previous Page
  • Go to page 1
  • Interim pages omitted …
  • Go to page 8
  • Go to page 9
  • Go to page 10

Footer

Find Success.

We can reach your goal. Contact me to start things off.

Get in Touch

  • LinkedIn
  • YouTube
  • About Me
  • Project Management
  • Operations Engineering
  • Motorsports
  • EWC
  • Blog

Copyright © 2026 Steve Beeler · All Rights Reserved · Privacy Policy